Date | Topic | Student Presentations | Student | Assignments |
1. Aug 27 | Introduction | | | |
2. Aug 29 | Cameras and optics | | | |
3. Sept 3 | Sampling and reconstruction | Smith 1995, Szeliski 2.3-2.3.1 | Rafael | |
4. Sept 5 | Color perception, light spectra | Szeliski 2.3.2 | Richard | |
5. Sept 10 | Blending and compositing | Porter and Duff 1984, Perez et al 2003 | | |
6. Sept 12 | Texture synthesis (basic) | Efros and Leung 1999, Efros and Freeman 2001 | Jin | |
7. Sept 17 | Texture synthesis (PatchMatch) | Barnes et al 2009 | Hui Ying | |
8. Sept 19 | Image retargeting | Seam carving, Improved seam carving | Chi | |
9. Sept 24 | Wavelets / frequency decompositions | Chen et al 2007 | Wang, Jacob | Assignment 1 due (Tues, Sept 24) |
10. Sept 26 | Image warping / morphing | Beier and Neely 1992 | Liu, Abbas | |
11. Oct 1 | Guest talk -- David Luebke, NVidia | | | |
12. Oct 3 | MRFs, BP, Graph cut | Kwatra et al 2003 | Puneet | |
| | | | Assignment 2 due (Mon, Oct 7) |
13. Oct 8 | Matting | Levin et al 2006 | Hou | |
14. Oct 10 | Project proposal presentations | | | Final project proposal due (+present) |
Oct 15 | No class -- reading day | | | |
Oct 17 | Finish project proposal presentations | | | |
15. Oct 22 | High dynamic range, tone mapping | Debevec and Malik 1997, Kalantari et al 2013 | Rafael | |
16. Oct 24 | Visual data and the Internet | Hays and Efros 2007 | Ritambhara | |
17. Oct 29 | Non-photorealistic rendering | Praun et al 2001 | Samyukta | |
18. Oct 31 | RANSAC and homographies | RANSAC, Lowe 2004 | Akshay | |
19. Nov 5 | Panorama stitching | Agrawala et al 2006 | Jeremy | |
20. Nov 7 | Light fields | Levoy and Hanrahan 1996, Gortler et al 1996 | Michael | |
21. Nov 12 | Guest -- Rick Stillings on photography | | | |
22. Nov 14 | Project progress presentations | | | Present progress, discuss problems |
23. Nov 19 | Motion magnification, [1], [2], [3] | Wadhwa et al 2013 | Paul | |
24. Nov 21 | Face detection | Viola-Jones 2001, Being John Malkovich | Chen | |
25. Nov 26 | Gigapixel imaging | Kopf et al 2007 | Yong | |
Wed 27-29 | No class -- Thanksgiving break | | | |
26. Dec 3 | Deblurring | Shan et al | | |
27. Dec 5 | Coded Exposures and Apertures | Raskar et al, Levin et al | Shanshan | |
28. Dec 10 | Final project presentation (Rice 120, 2-5 PM) | | | Final project writeup due (+present) |